It’s a win
Second day producing the same results with an entirely different team at a different location. Thinking I have the basis for a production theory. Gave the general outline to Bossman. But this could change several things. It requires a few things in regards to the team as well as buy in from a couple of teammates but other than that, it should be easliy integrated. A bit anxious to see the other KPI's because those will also be telling as to the right track.
Comments
Post a Comment